Maximum demand

Maximum demand is the highest electrical load a site places on its supply over a defined period. For EV charging design, it is used to assess whether the existing electrical installation and grid connection can support the proposed charging load. Simply adding together the nameplate rating of every charger can overstate what the site will actually draw, because vehicles do not always charge simultaneously or at maximum power. Existing building demand must also be considered. Load balancing can control EV demand so the site's actual maximum stays within an acceptable limit, allowing more charge points to share the available capacity.

Get in touch

Ready to talk through your project?

Tell us what you're building and our engineers will help you scope the fastest, lowest-risk route to market. A conversation directly with the people who design the charging modules.

Your enquiry is sent directly to the Versinetic engineering team. We do not share your information with third parties. By submitting this form you agree to our Privacy Policy.