Agreed import capacity

Also called: AIC, agreed capacity for import Agreed import capacity is the maximum level of power a site's connection agreement allows it to import from the electricity distribution network. It is one of the key constraints used when assessing how much new electrical load a site can support. EV charging can push a site closer to this limit because many charge points may operate at the same time as existing building loads. Increasing connection capacity can require DNO approval and, in some cases, network reinforcement. Load balancing or an approved limitation scheme can sometimes allow more charging infrastructure to be installed while keeping actual site import within the agreed boundary.

Get in touch

Ready to talk through your project?

Tell us what you're building and our engineers will help you scope the fastest, lowest-risk route to market. A conversation directly with the people who design the charging modules.

Your enquiry is sent directly to the Versinetic engineering team. We do not share your information with third parties. By submitting this form you agree to our Privacy Policy.