Skip to content
EV charging glossary

Industry jargon

Agreed export capacity

Also called: AEC, agreed capacity for export Agreed export capacity is the level of electrical export permitted at a customer's connection to the distribution network. It matters where a site can send power back through the connection from generation, battery storage or bidirectional EV charging. The exact contractual terminology can vary by network operator. The practical engineering requirement is to keep export within the limit agreed for the connection. A G100 export-limitation scheme can be used where the DNO agrees that export must be controlled rather than allowing the connected equipment's unconstrained maximum.

Get in touch

Ready to talk through your project?

Tell us what you're building and our engineers will help you scope the fastest, lowest-risk route to market. A conversation directly with the people who design the charging modules.

Your enquiry is sent directly to the Versinetic engineering team. We do not share your information with third parties. By submitting this form you agree to our Privacy Policy.